How to install the water and electricity of the experimental platform?
如果需要添加关键字库,直接把文本复制到当前目录即可,注意编码格式一定要是utf-8,不然会乱码 How to install the water and electricity of the experimental platform? -Hangzhou haomg Experimental Equipment Co., Ltd
Release time: February 20, 2019 15:33:14 hits: 1531
How to install the water and electricity of the experimental platform? Laboratory furniture, fume hood, water and electricity engineering installation conditions, water supply and drainage: the construction unit should reserve the water supply and drainage in advance at the indoor position designated by us, and the water supply pipe should be provided with valves for us to install.
Strong current and weak current: each laboratory shall be equipped with distribution box by the construction unit. There shall be enough current range and interface position for our lead wire. The distribution box shall be equipped with air switch and leakage protection. Each laboratory shall be equipped with all LAN line interfaces required by the instrument, which shall be introduced by us The experimental station
Wall, floor and ceiling: before our construction, the construction unit shall complete the handover of floor, wall and the buyer. The ground flatness error is less than 3 mm. Place the bottom cabinet of each unit vertically according to the icon position and adjust the level. Connect the bottom cabinet of each unit in the same horizontal position. If it is an independent unit bottom cabinet, it should also be fixed on the laboratory floor in an appropriate way.
Installation of accessories, and pay attention to all kinds of utility system pipelines can not have any winding or entanglement. If necessary, the units will be closely combined at the same level, and adjacent drawers and door panels will be in the same central line. Adjust the door and drawer of each bottom cabinet to open and close smoothly without any obstruction or loss of normal function.
On site construction: when the joint of the abutment panel must be bonded at the construction site, the process shall be the same as that in the factory. The special adhesive specified by the manufacturer, the fixture and construction method specified by the manufacturer must be used for connection. Most cutting, rounding and gutter processing of the abutment panel shall be finished before the processing in the factory, and shall not be processed on site.